AddEnergie SmartDC Руководство по установке - Страница 14
Просмотреть онлайн или скачать pdf Руководство по установке для Зарядное устройство AddEnergie SmartDC. AddEnergie SmartDC 15 страниц. V2
Care and Maintenance of the Station
THIS STATION REQUIRES YEARLY MAINTENANCE TO ENSURE PROPER OPERATION.
MAINTENANCE MUST BE PERFORMED BY ADDÉNERGIE.
It consists of:
1 . Cleaning or replacing the cooling system filters .
*It is important to maintain proper airflow inside the station to adequately cool the power modules .
2 . Inspecting the critical components of the station .
*Cables/connectors, power modules, etc .
It is recommended to increase the frequency of station maintenance to 4 times a year in the following
situations:
• When the station is installed in a dusty area .
• When the station's average cumulative use exceeds 1 hour of charging per day .
2017 ADDÉNERGIE TECHNOLOGIES INC. ALL RIGHTS RESERVED. Information and Specifications Contained in this Document are Subject to Change, Amendments, and Additions at any Time, Without Notice
14