3onedata TNS5800 Series Руководство по быстрой установке
Просмотреть онлайн или скачать pdf Руководство по быстрой установке для Переключатель 3onedata TNS5800 Series. 3onedata TNS5800 Series 3 страницы. Layer 3 rack-mounted industrial ethernet switch
Также для 3onedata TNS5800 Series: Руководство по быстрой установке (4 страниц), Руководство по быстрой установке (4 страниц), Руководство по быстрой установке (5 страниц), Руководство по быстрой установке (4 страниц)
TNS5800 Series (12 Ports)
Layer 3 Rack-Mounted
Industrial Ethernet Switch
Quick Installation Guide
3onedata Co., Ltd.
Address: 3/B, Zone 1, Baiwangxin High Technology
Industrial Park, Xili, Nanshan District, Shenzhen
Website: www.3onedata.com
Tel: +86 075526702688
Fax: +86 075526703485
【Package Checklist】
Please check the integrity of package and accessories while
first using the switch.
1.
Industrial Ethernet switch
2.
Lugs
3.
Warranty card
4.
Certificate
If any of these items are damaged or lost, please contact our
company or dealers, we will solve it ASAP.
【Product Overview】
This series of products are layer 3 rack-mounted industrial
Ethernet switches designed for the rail transit industry. For
convenience, the products of this series adopt the following
number on the left in this guide, please affirm the number of
your product.
Model I.
TNS5800-12GT-X-2P110 (12 Gigabit M12,
110VDC dual power supply input)
Model II.
TNS5800-8T4GT-2P110(8 100M M12 + 4 Gigabit
M12, 110VDC dual power supply input)
【Panel Design】
Front view
Model I
Model II
1.
Lugs
2.
Grounding screw
3.
Power P1 input terminal (P1)
4.
Relay alarm output terminal block
5.
Power P2 input terminal (P2)
6.
Power supply indicator (P1-P2)
7.
Running indicator (RUN)
8.
Alarm indicator (ALM)
9.
CONSOLE port
10.
Gigabit M12 interface (G1-G8)
11.
Gigabit Bypass M12 interface (Bypass: G9-G11,
G10-G12)
12.
Ethernet link indicator (1- 8, G1-G12)
13.
100M M12 Interface (1-8)
14.
Gigabit Bypass M12 interface (Bypass: G1-G3,
G2-G4)
【Mounting Dimension】
The shell dimension of this series of devices is the same, and
the dimension figure of model I is shown below. Unit: mm
Notice Before Mounting:
Don't place or install the device in area near water or
moist, keep the relative humidity of the device
surrounding between 5%~95% without condensation.
Before power on, first confirm the supported power
supply specification to avoid over-voltage damaging the
device.
The device surface temperature is high after running;
please don't directly contact to avoid scalding.
【Rack-mounted】
Step 1
Select the device mounting position and ensure
enough mounting size is reserved.
Step 2
Adopt bolts to install the mounting lugs in the
device position as figure below.
Step 3
Place the device on the rack surface plate; adopt 4
screws to mount the right and left mounting lugs on
the rack.