Anzzi Anzzi SB-AZ01NO Руководство по установке и эксплуатации - Страница 12

Просмотреть онлайн или скачать pdf Руководство по установке и эксплуатации для Сантехника Anzzi Anzzi SB-AZ01NO. Anzzi Anzzi SB-AZ01NO 14 страниц. Shower base

Anzzi Anzzi SB-AZ01NO Руководство по установке и эксплуатации
STEP 6
It is recommended not to stand in base
while securing to wall. Set base in corner
and press it into mortar.
Secure flanges to all studs with #8(1-1/2")
screws through previously drilled holes.
(Fig 6)
IMPORTANT: Gaps between flanges
and studs must be less than 1/8".
Insert shims to fill gaps if needed.
STEP 7
Allow the mortar to completely harden before applying weight to the bottom of the shower
tray.
Install the Drywall above the tile flanges and secure it to the studs.
Put the tiles (or other finishing wall material) over the drywall leaving 1/8" gap between the
bottom of the tile and the splash rim of the shower tray. Use caulk to fill that gap. (Fig 7)
Caulk
1
3
4
1/8"
gap
Base
Side View
Fig. 7
Fig. 6
2
Waterproof Drywall to the
top of the tile flange
Stud
Drywall
e
Finished wall overlaps the
dry wall and tile flange
Shim
Shim
10