Cascade 90FX Инструкция по установке - Страница 12

Просмотреть онлайн или скачать pdf Инструкция по установке для Вилочные погрузчики Cascade 90FX. Cascade 90FX 14 страниц. Swing frame paper roll clamp

I
NSTALLATION
10
Cycle attachment functions
IMPORTANT: Make sure hydraulic system
is purged of air before checking attachment
functions outlined below (see Step 9).
With no load, cycle all functions several
times.
Check functions for operation in accor-
dance with ITA (ISO) standards.
Clamp and rotate a maximum load, check
for smoothness and normal rotation.
Check for leaks at fittings, revolving
connection and cylinder rod ends.
NOTE: Extension or retraction of swing
cylinder swings attachment up or down,
left or right, depending on which orienta-
tion clamp arms are rotated to.
10
WARNING: Make sure all
personnel are clear of the
clamp during testing.
SWING
(Bilge handling shown)
A
(Push button) Extend
B
(Push button) Retract
A
B
RC0963.ill
AUXILIARY VALVE FUNCTIONS
GA0005.ill
C
D
B
A
D
C
RC1550.ill
Tilt Forward
Hoist Down
C
A
B D
Hoist Up Tilt Back
LONG ARM
(vertical & horizontal
positions only)
C
Release
D
Clamp
RC1549.ill
ROTATE
(Driver's view)
A
Counterclockwise (CCW)
B
Clockwise (CW)
SHORT ARM
(45 degree position only)
C
Open
D
Close
6028021 Rev. 1