Step 1: Front Wall: Position first wall sheet on the
left hand side of the doorway with the sheet LIP
on the left hand side. Ensuring the LIP is flush
with the side of the corner Stud and the top is
45mm below the top of the Ridge Beam, tack in
place. Repeat on other side of doorway.
Step 2: Back Wall: Position the first Wall Sheet with
the LIP on the right hand side. Ensuring the LIP
is flush with the side of the corner Stud and the
top of the Wall Sheet is flush with the top of the
Top Plate, tack in place. Position the next Wall
Sheet with the LIP on the right hand side. Over-
lap as shown in fig 1. Ensuring Wall Sheet is
flush with top of Top Plate, tack in place. Re-
peat with remaining Wall Sheet.
Step 3: End Walls: Position wall sheet with the LIP
flush with the side of the stud and the top of
the Wall Sheet is flush with the top of the Top
Plate, tack in place. Tack in remaining 1/2 Wall
Sheet. Repeat with the other end. If fitting a
window, nail in Window Studs and Nog now.
Refer to Window instructions.
Step 4: Nailing Off: Nail one 30mm Clout each side of the Rib (two per Pan) into the Top Plates and Bottom
Plates. Nail
30mm Clouts evenly spaced.
KL3 WALL CLADDING
Wall Sheets to mid wall Nogs (one per pan). Nail each corner Wall Sheet to Studs using two
7
45mm BELOW
TOP OF RIDGE
EDGE
FLUSH
BEAM