LOUVRE WINDOW
Step 1: Lay out the two window studs (883mm) and
Nog (634mm) on a flat surface. Position
Nog and nail in place using 2x 75mm nails
at each end.
Step 3: Nail wall Sheets to window framing using
30mm clouts. (return to step 4 on page 7
and complete). Then fit Window Frame).
Position Window Frame centrally on win-
dow opening and rivet it to ribs. Pre-drill
holes in each corner and nail Window
Frame to framing, using 50mm nails.
FIXED WINDOW
Step 1: Lay out the two window studs (883mm) and
Nog (590mm) on a flat surface. Position
Nog and nail in place using two 75mm nails
at each end.
KL1 WINDOW (Optional)
588mm
50mm
NAILS
RIVITS
570mm
Step 2: On the inside of the shed, position studs
and Nog centrally on window opening.
Make sure the studs are parallel and nail
into Top Plate and End Wall Nog.
Step 6: From the inside of the shed, slide Louvre
Glass into Louvre Units attached to the
Window Frame. Bend up tabs to keep
Glass in position.
Step 6: From the outside of the shed, place glass
in Window Frame. Attach a Glazing Bead
(G100) with three rivets to each side of the
Window Frame to hold glass in place. Pre-
drilling Glazing Beads is recommended.
8