DURKOPP ADLER 911 Руководство по эксплуатации и монтажу - Страница 17

Просмотреть онлайн или скачать pdf Руководство по эксплуатации и монтажу для Швейная машина DURKOPP ADLER 911. DURKOPP ADLER 911 18 страниц. Cnc-controlled sewing unit with large sewing area

DURKOPP ADLER 911 Руководство по эксплуатации и монтажу
8.

Putting into operation

A sewing test should be carried out when setting-up is complete.
Plug the mains cable into the socket.
Caution: Risk of injury!
Turn off the main switch.
The needle and hook threads may only be threaded with the sewing
unit switched off.
Threading the needle thread (see operating instructions
chapter 6.4).
Threading the hook thread (see operating
instructions chapter 6.7).
Turn on the main switch.
The control unit will be initialised.
Step the pedal forward.
The reference run begins.
The carriage moves to the reference point.
The reference run is necessary in order to define a starting
position for the transport carriage.
Through stepping the pedal forward, the various steps of the
feeding process are initiated one after the other and the sewing
process is started.
ATTENTION!
Please make sure that material is positioned under the transport
clamps at the sewing start.
Moving the transport carriage without material will damage the
coating of the transport clamps.
For the selection of the sewing program and for further settings of
the control unit see chapter 7 of the operating instructions.
2
13