DataTale FireWire 400 Руководство пользователя - Страница 18

Просмотреть онлайн или скачать pdf Руководство пользователя для Шкаф DataTale FireWire 400. DataTale FireWire 400 20 страниц. 4-bay smart raid system
Также для DataTale FireWire 400: Руководство пользователя (14 страниц)

4. When connected, the Power LED light will become steadily green, and the
Hard Drive LED lights will become white and blink about 15 seconds. If the
hard drives are inside the RAID System, the Hard Drive LED lights will remain
steadily white; and the LCM Panel will show "Initializing...", then "DataTale
ONNTO Corp.". If there are no hard drives inside the RAID System, the Hard
Drive LED lights will turn off after blinking; and the LCM Panel will only show
"DataTale ONNTO Corp.".
5. You are now ready to begin using your RAID System!
Due to compatibility issues, if you use the eSATA interface to do the data
transfer, the Silicon Image eSATA host controller is highly recommended.
 
DataTale
ONNTO Corp.
Ready
to go!
18