Aussie Pumps Scud 100 Руководство по эксплуатации - Страница 6

Просмотреть онлайн или скачать pdf Руководство по эксплуатации для Водяной насос Aussie Pumps Scud 100. Aussie Pumps Scud 100 16 страниц.

Aussie Pumps Scud 100 Руководство по эксплуатации
Aussie Pumps
ASSEMBLY AND PREPARATION FOR USE
Before proceeding with assembly of your new Aussie
Eco Scud high pressure blaster, check that all parts
listed below are included.
1 x safety eyewear
1 x gun handle assembly
1 x high pressure hose
1 x dual lance & nozzle assembly
1 x detergent injector kit
HEAVY DUTY LANCE: To assemble the gun/lance,
screw together and check nozzles have been fitted to
end of lance.
A.
Machine Preparation (initial start-up)
1.
Check the oil in the pump and gearbox.
Note separate reservoirs. With the machine on
a level surface the oil lever should cover the red
spot in the oil level sight glass on the side of the
machine. If necessary, top up with SAE 75W-90.
Do not mix different grades of oil as this may
Aussie Safety Protection Kit
Detergent injector
HP hose
connection
Supply hose
connection
Y strainer
WORK SMART ... STAY SAFE
6
Unloader - factory set, DO NOT adjust
| Aussie Scud, Ultra A & Predator A ... Operator's Instruction Manual
affect the machines performance. If alternative
oil is used, first empty out oil by unscrewing
drain plug in bottom of machine.
2.
Ensure breather plug is fitted to pump.
Breather plug
WARNING:
Before
mounted travel plug is replaced by breather
plug. Failure to fit breather and keep clean can
result in over pressuring of oil chamber (crank
case) and can blow oil seals.
warranty.
3.
Note that the gearbox has a separate oil
reservoir. Gearbox oil is SAE 90 gear oil.
4.
Connect
battery
machines.
5.
Check oil level in engine and fill with proper
grade oil if necessary. (SAE 10W-30 for Honda
engines, check engine manual for other makes)
6.
Check fuel level and fill if necessary. (unleaded
petrol)
7.
Fit detergent injection kit to unloader using the
quick coupler (no tools required).
Safety valve
Thermal dump
Mar 2021
operation
ensure
This will void
leads
on
electric
start
top