Hi-Force TLE50 Series Руководство по эксплуатации - Страница 12

Просмотреть онлайн или скачать pdf Руководство по эксплуатации для Джеки Hi-Force TLE50 Series. Hi-Force TLE50 Series 18 страниц.

1. Connect the ToughLift unit to the available power source.
2. Turn the motor on by pressing the green 'ON' button (9) on the electrical control box (10).
3. Using the remote 'control pendant' (8), press the 'UP' button to extend/ advance the jacking cylinder
and the 'DOWN' button to retract / lower the jacking cylinder. (See figure 6.1)
4. Advance the jacking cylinder to lift the load. Check constantly to make sure the load is stable and
that the jack remains in a fixed and stable, 'vertical' position.
5. Fit load blocks as required and lower the load onto the load blocks (if used).
6. Retract the jacking cylinder to lower the load. Check constantly to make sure the load is stable and
that the jack remains in a fixed and stable, 'vertical' position.
7. Turn the motor off by pressing the red 'OFF' button (9) on the electrical control box (10).
Operating Instruction Manual:

6.0 Operation

Figure 6.1: Control Pendant Operation
12
OM-TLE50-01
From Serial Number:
All