Great Lakes UL60950-1 Руководство по установке - Страница 10

Просмотреть онлайн или скачать pdf Руководство по установке для Стойки и подставки Great Lakes UL60950-1. Great Lakes UL60950-1 12 страниц. 4 post equipment racks
Также для Great Lakes UL60950-1: Руководство по установке (8 страниц), Руководство по установке (13 страниц)

Great Lakes UL60950-1 Руководство по установке
ASSEMBLY
1. Assemble top and bottom width
brackets to uprights (place the
bracket with the Great Lakes
label on the top). Do not tighten.
Bottom width brackets can be
assembled with in toe out or toe
in mounting.
2. Assemble the top and
bottom depth brackets to
the uprights and stand
assembly up. Make sure
rack is square and then
tighten all hardware
(54 ft-lb torque is recommended).
3. Secure rack to floor. All racks should be bolted to a masonry floor,
or to an equally stabilizing and secure surface, after desired location is
determined. Hardware is not provided for bolting rack to the floor, but
Great Lakes' AK101 Seismic Anchor Kit is recommended for masonry
floors.
3
4. Install main protective earthing lug with #12-24 x 1/2" screw at
main ground symbol located at the base of the upright on the #12-24
tapped hole.
BOTTOM BRACKET - TOE OUT MOUNTING
Main Ground Symbol
Protective
Earthing Lug
7
#12 Ext.
Tooth Washer
#12-24 x
1/2"LG Screw
1/2"-13 x 1"
Hex Head
Bolt
1/2" Ext.
Tooth Washer
10
TOP BRACKET
1/2" Ext.
Tooth Washer
1/2"-13 x 1" Hex
Head Bolt
2
6
1/2" Ext.
Tooth Washer
1
1/2"-13 x 1"
Hex Head
5
Bolt
1/2" Ext.
Tooth Washer
1/2"-13 x 1"
Hex Head
Bolt
D
4
C