Great Lakes VCMX-45U-1012FO-M Инструкции по установке в метрической системе - Страница 3
Просмотреть онлайн или скачать pdf Инструкции по установке в метрической системе для Стойки и подставки Great Lakes VCMX-45U-1012FO-M. Great Lakes VCMX-45U-1012FO-M 6 страниц. Vertical cable managers
VCMX-FO INSTALLED WITH GREAT LAKES RACKS
TOOLS:
17mm and 10mm sockets or wrench
ASSEMBLY
1. The VCMX can be used in between two racks, at the end of a row or mounted to a single rack.
If used between two racks, space 154mm apart.
2. A. Loosen but do not completely remove the first M10 bolt and star washer from the top of 4
post rack as shown in Front Rack View.
NOTE: Do not remove the bottom bolt!
B. Remove second M10 bolt and star washer from the bottom of 4 post rack as shown in
Front Rack View.
NOTE: Do not remove the bottom bolt!
3. Hook vertical cable manager through keyway holes onto the top bolt of the 4-post rack.
NOTE: Do not tighten any hardware until carriage bolts are in place.
4. Secure the sides of the VCMX to rack with M6 carriage bolts, washers, and M6 nuts as
shown in Detail A.
5.Reinstall bolt and start washer on bottom of frame through VCM
6. Insert auxiliary foot support from inside of cable manager as show in Detail B.
7. Tighten all bolts to secure vertical cable manager
8
Front Rack View
A
7
Loosen, but DO
NOT REMOVE bolt
DO NOT
and star washer
REMOVE
Remove Bolt and
Star washer
DO NOT REMOVE
D
C
6
B
A
5
A
B
8
DO NOT R
LOOSEN,
DO NOT R
AND STAR
REMOVE B
AND STAR
DO NOT R
4
7
3