Great Lakes UL60950-1 Руководство по установке - Страница 7

Просмотреть онлайн или скачать pdf Руководство по установке для Шкаф Great Lakes UL60950-1. Great Lakes UL60950-1 8 страниц. 4 post equipment racks
Также для Great Lakes UL60950-1: Руководство по установке (13 страниц), Руководство по установке (12 страниц)

Great Lakes UL60950-1 Руководство по установке
STEP 2
A. Leaving vertical upright channels on edge, align holes in base
with corresponding holes in each upright channel. Long leg of
base should be facing you.
B. Install 4 hex head bolts and lock washers. Finger tighten only.
C. Turn vertical upright assembly over (rotate 180 degrees) and
repeat steps A and B. Finger tighten only.
STEP 3
A. Stand rack upright.
B. Square unit using a level or carpenter square.
C. Tighten all bolts using socket or wrench. (54 ft-lb torque
is recommended).
STEP 4
Secure rack to floor.
All racks should be bolted to a masonry floor, or to an equally
stabilizing and secure surface, after desired location is
determined. Hardware is not provided for bolting rack to the floor,
but Great Lakes' AK101 Seismic Anchor Kit is recommended for
masonry floors.
STEP 5
Install main protective earthing lug as shown.
B
B
A
Main Ground Symbol
Protective Earthing Lug
#12 Ext. tooth washer
#12-24 x 1/2"lg. Screw
8
EXPLODED VIEW
7
6
7