HI-PRESS TANGYE HYDRALITE PS630 Руководство по эксплуатации и технике безопасности - Страница 4

Просмотреть онлайн или скачать pdf Руководство по эксплуатации и технике безопасности для Джеки HI-PRESS TANGYE HYDRALITE PS630. HI-PRESS TANGYE HYDRALITE PS630 10 страниц.

HYDRAMITE
Fig. 1
Function
(read in conjunction with Fig. 1)
The permissible working load and the travel of the hydraulic jack are marked on the equipment.
The jack (1) has an in -built hydraulic pump, which is worked by means of an operating lever (2),
under the control of the o perator. The jack ram (3) is raised on each downward stroke of the
lever. For lifting, the lever is placed fully into the operating socket (4).
For lowering, the lever is removed from the socket and placed into the release screw (5).
Turning this anti -clockwise will allow the ram to descend. The amount this is rotated will
control the speed of descent; only open a very small amount (approx. 5°) at first.
Close the release valve after use, to ready the jack for the next operation.
Operating Positions
The hydraulic system is sealed – the jack may be used in any mounting position.
Oil Level Check
Lay the jack on its side with the filler plug uppermost and remove the filler plug. There should
be no airspace under the plug.
If oil needs to be added ens ure that the surrounding area is clean and fill to the bottom of the
plug threads. Use high quality hydraulic oil such as Shell Tellus ISO 32 or equivalent.