DAYTEK MK2 TWIN Руководство по эксплуатации - Страница 7

Просмотреть онлайн или скачать pdf Руководство по эксплуатации для Бытовая техника DAYTEK MK2 TWIN. DAYTEK MK2 TWIN 8 страниц. Fold down clotheslines

DAYTEK MK2 TWIN Руководство по эксплуатации
OPERATING YOUR FOLD DOWN CLOTHESLINE
TO RAISE
Grip the center of the Front Bar with one or two hands
as shown below. Gently raise the bar to the maximum
point of travel, push inwards with even force until it
hits a hard stop and then release.
The clothesline will be locked into the upright position.
1
LIFT
Note: Raising the frame without gripping the
center may result in only one arm locking
correctly. If this occurs, raise the affected arm
to max height and press inwards until it hits a
hard stop and release.
IMPORTANT! Maximum recommended loading of this clothesline is 1kg per meter of line.
Refer to your individual clothesline for specified line space.
TO LOWER
Grip the centre of the Front Bar and gently lift the
clothesline upwards to the maximum point of travel.
Pull outwards to unlock the bracket and lower.
PUSH
2
3
LOWER
PULL
2
1
LIFT
7