Hickory N/5.5 G Руководство по установке - Страница 14

Просмотреть онлайн или скачать pdf Руководство по установке для Кухонная техника Hickory N/5.5 G. Hickory N/5.5 G 18 страниц. Hickory rotisseries installation manual

NOTE:
If fat or carbon have built up on the center shaft, it may not be possible to move
the alumium disks!
With the disks away from the sides, all components of the drive mechanism should be
thoroughly cleaned. This will guarantee that the drive mechanism works smoothly.
Even though the aluminum disks protect the gears, fat will eventually manage to
build up on the gears. If this fat is not cleaned, it will eventually carbonize. When the
carbon build-up is serious enough, the drive mechanism will jam and it will need
to be replaced.
When replacing the disks, a slight dab of FDA (food safe) approved gease should be added
to all gears.
Finally, when inserting spits, make sure to stop the motor! This unit is supplied with a motor
switch which will stop the drive mechanism, allowing the operator to insert the spits easily.
If spits are inserted without stopping the motor, there is a chance that the drive system will be
jammed and cause severe damage.
1.14
Testing or checking for safety
After a conversion, a new installation, or after a repair, it is important that the unit be
tested to insure that it operates properly. This should include the following:
Test the gas system for gas leaks.
Check that the unit has enough clearance behind and to the sides.
Check that enough primary and secondary air is available (bright orange gas generator).
Check for potentially flammable objects or potential flammability problems.
Check for proper ventilation and exhaust.
Check for proper room ventilation.
1.15

Description of the Electrical Connection

The electrical connections are to be made in accordance to local and national codes.
All gas machines operate with 120 Volt, single phase, 60 Hz. A NEMA 5-15P plug
is supplied with the units.
All pertinent electrical information can be taken from the electrical diagram.
NOTE:
Proper polarity in the electrical system is needed for proper
operation of the gas system!
4900 Westside Avenue, North Bergen, New Jersey 07047
Tel: [201] 223-0050 Fax: [201] 223-0950
Hickory Industries, Inc.
N/5.5 Installation 8/5/97
Page 14 of 18