DBK Drymatic Boost Bar FGPH109 Руководство по эксплуатации - Страница 12
Просмотреть онлайн или скачать pdf Руководство по эксплуатации для Сушилка DBK Drymatic Boost Bar FGPH109. DBK Drymatic Boost Bar FGPH109 16 страниц. Adaptable heat drying system
Также для DBK Drymatic Boost Bar FGPH109: Руководство по эксплуатации (18 страниц)
o
C) 90
Adaptor
The Drymatic Boost Bar 90° Adaptor is designed to divert the heated airflow in one of two different ways:
1.
Upwards—This could be used to simply heat the ambient air in a room or a ceiling void in combination with lay flat
ducting.
2.
Downwards—This configuration is to be used when heating up a subfloor/crawlspace area.
Step 1 — Connect Adaptor
Take the adaptor and slide it into the outlet of the Drymatic Boost Bar. The adaptor will locate itself between the ribbed
features in the outlet of the Boost Bar, secure with the latches. The adaptor outlet should be placed in the desired
orientation by the technician.
Step 2— Connect lay flat ducting (Optional)
Cut the lay flat ducting to the required length and attach to the outlet of the 90° Adaptor using adhesive tape.
Take the end of the ducting and feed it in to a tented chamber or directly in to the void/cavity that is being targeted.
Please Note:
When using lay flat ducting tied off at the ends to create a pressure vessel, there will be an increased amount of back
pressure placed on the Boost Bar. In this situation the Boost Bar will ramp down heater power and will no longer deliver
maximum power.
The Air-Off temperature of the Boost Bar is limited to 122°F (50°C). It is recommended that the lay flat ducting used is
rated for temperatures greater than 140°F (60°C).