Highland heat Kompakt 12 Руководство пользователя - Страница 7

Просмотреть онлайн или скачать pdf Руководство пользователя для Котел Highland heat Kompakt 12. Highland heat Kompakt 12 20 страниц. Solid fuel boiler

Kompakt
3. Construction

3.2 Boiler

The boiler heat exchanger consists of three main zones. Two
(three 20 kW) horizontal heat exchangers (2) are located in
the area of the upper door. The cleaning door (9) is used when
it is necessary to clean the surface of the heat exchanger.
There is a solid fuel combustion chamber in the area of the
fuel loading door (12). Through this door, the fuel is loaded into
the combustion chamber. Service doors (13), an ash box is
installed in the area for ash removal. The boiler is equipped with
a thermometer (8) and it is possible to install a draft regulator.
The internal heat exchanger body of the boiler is made of bent
and welded heat-resistant steel sheets, and the finish is made
of powder-coated sheets. Under the boiler finish is an insulating
layer of glass wool, which protects against heat loss through
the boiler's outer walls. The double doors are sealed with heat-
insulating material and painted with heat-resistant paint.
Gases generated during combustion are removed through
the chimney pipe (1) installed in the upper part of the boiler.
The boiler works on the principle of direct combustion, so it is
possible to burn wetter fuel.

3.3 Boiler set

1. Ashtray
2. Instruction
3. Thermometer
4. Transition sleeve
5. Legs
7