Galvin Engineering CliniMix CP-BS Установка изделия Manualline - Страница 8

Просмотреть онлайн или скачать pdf Установка изделия Manualline для Сантехническая продукция Galvin Engineering CliniMix CP-BS. Galvin Engineering CliniMix CP-BS 16 страниц. Inwall thermo progressive shower mixer with galvincare handle w&c

Galvin Engineering CliniMix CP-BS Установка изделия Manualline
7.
Fit the inner faceplate into the outer faceplate.
Ensure the marking on the top of the plate is
positioned correctly.
Note: Before tightening the flange make sure the handle
fits correctly. Put screws into flange and tighten finger
tight, the flange should still be able to move. Slide the
handle onto spline and move the flange until central to the
handle. Remove handle and tighten the screws (it is best
to tighten the screws in sequence a little at a time to avoid
the flange moving). Refit handle.
11.0

ADJUSTMENT OF THE MIX TEMPERATURE

1. Set the handle to cold position.
4. Remove the lower brass ring
(temperature setting ring) and
rotate the brass ring
clockwise to increase
temperature or anti-clockwise
to decrease. Refit to spline in
new position.
8. Fit the handle and fasten so the arrow shape on
top of the handle matches the marking on the
faceplate.
2. Unscrew the tamper proof
screw from handle. Pull out
handle assembly from the
body
5. Reposition the upper ring
in the same position
against step.
Version 2, 31 October 2019, Page 8 of 16
Version 3, 14 December 2018, Page 8 of 16
3. Remove the upper brass ring. Make
sure the
ntr
r d d esn't r t te
during the next steps.
6. Once set, reverse step 2 to
reassemble.
7. Re-test temperature to ensure correct
operation.