Main Combi 25 Eco Elite Руководство пользователя и важная информация о гарантии - Страница 6
Просмотреть онлайн или скачать pdf Руководство пользователя и важная информация о гарантии для Котел Main Combi 25 Eco Elite. Main Combi 25 Eco Elite 12 страниц. Main combi eco range user's guide and important warranty information
Fig. 1
Fig. 2
Flexible Hose
Taps
6
© Baxi Heating UK Ltd 2009
2
1
3
0
4
bar
Normal Pressure
2
1
3
0
4
bar
Requires
Repressurising
Fig. 3
3.0 Repressurising System
3.1
Central Heating System Pressure
1. The normal operating water pressure is when the
needle is in the GREEN section of the gauge, between 1
and 2.5 bar (Fig. 1). If the pressure exceeds 3 bar (needle
in the RED section) the safety pressure valve will operate
and a fault is indicated. Contact your installer.
2. It may be necessary to repressurise the system
occasionally (Fig. 2). The needle will be in the lower RED
section of the gauge, between 0 and 0.5.
3.A filling device (the filling loop) will be fitted on the
system. This will be on the boiler itself (Fig. 3), or on
pipework near to the boiler.
4. If you are unsure of its position, or cannot identify it,
consult the installer who fitted the boiler.
5. The filling loop consists of two taps and a separate
flexible pipe with connection fittings.
6. Only when repressurising should the flexible pipe be
connected between the two taps. Ensure that the nuts
on the pipe ends are tightened onto the taps.
7. Fully open one of the taps first, and then while
watching the pressure gauge, carefully open the second
tap.
8. When the needle on the gauge is indicating 1 or more,
in the green section of the gauge, turn both taps off.
9. Disconnect the flexible pipe from the taps (a small
amount of water may be present) and remove it. Keep
the pipe in a safe place for future use.