AgSense CROP-LINK Инструкции по подключению - Страница 8
Просмотреть онлайн или скачать pdf Инструкции по подключению для Блок управления AgSense CROP-LINK. AgSense CROP-LINK 10 страниц. 2012 - 14 soil moisture monitoring
Также для AgSense CROP-LINK: Инструкции по подключению (8 страниц)
Power Requirements for the Crop Link unit:
SOLAR/DC Powered Unit 7-34V DC:
At 12v DC: 1.0A MAX
0.1A - 0.5A during normal operation
Recommended Solar panel – Must be a minimum of 10 watt @ 17v Solar panel.
Specs of solar panels that ship from AgSense:
10 watt
Operating Voltage 17v DC
Operating Current 0.59A
Open Circuit Voltage 21.2v DC
Short Circuit Current 0.69A
Warranty Information:
All warranty service provided by the AgSense service center, or an authorized technician.
Warranty repairs require a Return Merchandise Authorization Number (RMA);
Have your dealer contact AgSense to obtain this RMA number.
For the Period of :
60 Days
2 Years
What is not covered:
• Service trips to your home to teach you how to use the product.
• Improper installation, delivery or maintenance. If you have an installation problem contact your
dealer or installer.
• Failure of product resulting from modification to product or due to unreasonable failure to provide
reasonable and necessary maintenance.
AgSense will:
Money back Guarantee if not satisfied with
product.
Repair on any unit that fails due to defect in
materials or workmanship. AgSense labor
and parts would be provided free of charge
during the warranty period. (This does not
include dealer labor.)
Page 5