AGT INDUSTRIAL AGT-B1000 Руководство по эксплуатации - Страница 7

Просмотреть онлайн или скачать pdf Руководство по эксплуатации для Подъемные системы AGT INDUSTRIAL AGT-B1000. AGT INDUSTRIAL AGT-B1000 19 страниц. Two-post auto lift

2.2.5 Install BasePlate (Fig 6)
Place the Baseplate inside the columns slots. ( No screws needed)
2.2.6 Install Power Unit
Install power unit on the main column with M8 screws ( Fig 7 ) .
2.2.7 Install Anchor Bolts (Fig 8)
1. Adjust the distance between 2 columns as required dimensions (Fig 1) .
2 . Adjust the opening direction of the two columns in a straight line (visible).
3. Install Anchor Bolts (Suggest to use 3/4" Drill)
Note: Don' t Fasten/ Tighten Nuts now in case any adjustment needed.
4 . Adjust the verticality of the columns ( visible) and use U- shape washer( come with
Fig 5 Hydraulic Hose Diagram
Fig 6 Baseplate Installation Diagram
Fig 7 Power Unit Installation Diagram
Page 7 of 19