Gree GMV5 Series Техническое и сервисное руководство - Страница 7

Просмотреть онлайн или скачать pdf Техническое и сервисное руководство для Инвертор Gree GMV5 Series. Gree GMV5 Series 20 страниц.

Gree GMV5 Series Техническое и сервисное руководство

2.2.4 INTERFACE

1)Diagram of interface
2)Power
The input power is 100VAC-240VAC,50/60Hz.
WARNING! The ground protection of power input port must be connected; otherwise it
might be dangerous; besides, when the gateway is energized, don't touch the power input.
Note: the power cord shall be fixed with bonding clamp in the kit, as shown in the fig.
3)Communication interface
CAB communication interface: connect it to the AC unit through the 2-core communication
line to realize the communication between BACnet gateway and the AC which adopts CAN
protocol.
RS485-1 communication interface: this device will not use this communication interface
temporarily.
RS485-2 communication interface: this device will not use this communication interface
temporarily.
USB and SD card interface: this device will not use this interface temporarily.
Ethernet interface: realize communication through network cable and BMS.
GMV BACnet Gateway Technical Service Manual
CAN communication
interface connected
to the AC unit
Communication interface
of ethernet, used for
remote control
monitoring communication
Power input
4
Reserve 5-way
input IO port
Reserve 5-way
output IO port