AFRISO DIM 20 Руководство по эксплуатации - Страница 10
Просмотреть онлайн или скачать pdf Руководство по эксплуатации для Измерительные приборы AFRISO DIM 20. AFRISO DIM 20 20 страниц. Digital pressure gauge
Installation and commissioning
10
1.
Check the measuring range shown on the type designation
plate. Make sure the maximum pressure at the process connec-
tion is within the allowed measuring range.
2.
Remove instrument carefully from its packaging.
Mechanical connection procedure
Fig. 2: Connection according to EN 837
1.
Seal the connection of the DIM 20 with a suitable gasket, e.g.
copper gasket or similar, which is compatible with the medium
and pressure to be measured. The sealing gasket is not part of
our scope of supply.
2.
Ensure that the sealing surface of the connection part is in per-
fect condition.
3.
Screw in the DIM 20 by hand into the connection thread.
4.
Tighten DIM 20 with an open ended spanner SW24 with max.
20 Nm.
DIM 20