Airflow DUPLEXVENT DV145SE Инструкции по эксплуатации, техническому обслуживанию и эксплуатации - Страница 16
Просмотреть онлайн или скачать pdf Инструкции по эксплуатации, техническому обслуживанию и эксплуатации для Вентилятор Airflow DUPLEXVENT DV145SE. Airflow DUPLEXVENT DV145SE 17 страниц. Low-energy ventilation unit with heat recovery and demand-controlled automatic melting
Commissioning the System
The Building Regulations 2010, Statutory Instrument Part 9, paragraph 42, imposes a requirement that testing and reporting of mechanical
ventilation performance is conducted in accordance with an approved procedure.
Compliance with this requirement by an assessed and registered 'Competent Person' should follow a 'Best Practice' process and adopt air flow
measurement, Method A – The Unconditional Method – using a suitable UKAS certified measuring instrument. Generically referred to as a 'Zero
Pressure Air Flow Meter' or 'Powered Flow Meter'.
Further information on this method is detailed in NHBC Building Regulations Guidance Note G272a 10/13 and BSRIA 'A Guide to Measuring air
flow rates' document BG46/2015
www.airflow.com