DECKORATORS ALX CONTEMPORARY PRE-ASSEMBLED RAILING Инструкции по установке - Страница 3

Просмотреть онлайн или скачать pdf Инструкции по установке для Наружная отделка DECKORATORS ALX CONTEMPORARY PRE-ASSEMBLED RAILING. DECKORATORS ALX CONTEMPORARY PRE-ASSEMBLED RAILING 3 страницы.

Step 3 Reposition the post assembly with the leveling plate inserted between the deck and the post base, and aligned with the predrilled
holes. Insert the post fasteners (NOT INCLUDED), and partially tighten. Using a level, adjust the leveling set screws with a 3/16" allen wrench
until the post is plumb. Fully tighten the post fasteners to secure the base to the deck structure.
STOP – Make sure post base trim is installed before continuing.
Step 4 Measure the distance between installed posts to determine the length of the top and bottom rails. Position the railing on the stairs on
top of a spacer block along the stair nosings. Ensure the balusters are plumb. The distance between the post and the first baluster should be
less than 4" and equal on both ends. Once the railing is in position, clamp the railing to the posts.
Step 5 Temporarily assemble the swivel brackets. Position the swivel bracket in location and mark the rail and post. Repeat for other
end of railing. Note: The distance from the end of the top rail to the first stair baluster will be 1-1/16" longer than the bottom rail to ensure the
balusters are plumb. Add 3/4" to the marked location on the railing and cut to length.
Step 6 Mark locations of the bracket screw holes on the rails. Remove brackets. Predrill through the rail only, using a 9/64" drill bit. Attach the
front end of bracket to rails.
Step 7 Mark location of the bracket base screw holes on the post. Include the bracket side cover when determining the center location.
Predrill through the post, using a 9/64" drill bit. Position the base of each bracket with the bracket cover side facing the stairs, and attach to
the post with two screws.
Step 8 A rail support is needed every 2 feet (2 are included in the 6ft rail kit, 3 in the 8ft kit). Attach rail support connectors to the bottom
of the lower rail at 2-foot intervals using included screws. Predrill using a 1/8" drill bit. Mark the location of the rail support on the step tread
and attach the other rail support connectors to the step tread.
Step 9 Install the bottom railing between the posts by sliding the brackets together. Attach the side of the bracket with the barrel bolt to secure
in place.
Step 10 Set post caps on each post. Gently tap with rubber mallet to secure.
Distance Between Posts
48-in
Post
Post
Base
Trim
Mark Rail
for Length
THE DIAGRAMS AND INSTRUCTIONS IN THIS BROCHURE ARE FOR ILLUSTRATION PURPOSES ONLY AND ARE NOT MEANT TO REPLACE A LICENSED PROFESSIONAL. ANY CONSTRUCTION OR USE
OF THE PRODUCT MUST BE IN ACCORDANCE WITH ALL LOCAL ZONING AND/OR BUILDING CODES. THE CONSUMER ASSUMES ALL RISKS AND LIABILITY ASSOCIATED WITH THE CONSTRUCTION
OR USE OF THIS PRODUCT. THE CONSUMER OR CONTRACTOR SHOULD TAKE ALL NECESSARY STEPS TO ENSURE THE SAFETY OF EVERYONE INVOLVED IN THE PROJECT, INCLUDING, BUT NOT
LIMITED TO, WEARING THE APPROPRIATE SAFETY EQUIPMENT. EXCEPT AS CONTAINED IN THE WRITTEN LIMITED WARRANTY, THE WARRANTOR DOES NOT PROVIDE ANY OTHER WARRANTY,
EITHER EXPRESS OR IMPLIED, AND SHALL NOT BE LIABLE FOR ANY DAMAGES, INCLUDING CONSEQUENTIAL DAMAGES.
©2019 Universal Forest Products. Deckorators is a registered trademark of Deckorators, Inc. in the U.S. All rights reserved.
Post
Cap
39-in
Post
Mark Rail
for Length
Top and
Bottom Rail
68956 U.S. Highway 131, White Pigeon, MI 49099
Post
Cap
48-in
Post
Post
Base
Trim
fig. 8
10930 12/19
www.deckorators.com
Equal spacing
on both ends
Top Rail
Bottom Rail
Rail Support
Top Rail
Bracket
39-in
Post
Bottom Rail
Bracket
< 6''
fig. 9