MAK A20 Руководство пользователя - Страница 3
Просмотреть онлайн или скачать pdf Руководство пользователя для Хранение MAK A20. MAK A20 6 страниц. Vattery cabinet
USER MANUAL
www.mak-powersis.de
4. After installation is completed, checking all connections and voltage of battery are
accurate. Then install right and left side panels. Shown as Figure 5.
5. Cover the cabinet's cover. The installation of battery cabinet is completed. Shown
as Figure 6.
Figure 4
Figure 5
A20 Battery Cabinet