Empire DVCT35 Инструкции по установке - Страница 3

Просмотреть онлайн или скачать pdf Инструкции по установке для Крытый камин Empire DVCT35. Empire DVCT35 4 страницы. Blower & light replacement kit, dash-1 units

10. Remove 4 screws, bezel, gasket, and glass from
light assembly. Remove 4 screws holding the light
assembly to the firebox top and carefully remove it
from the unit. Discard all of these items, they will not
be needed. See Figure 9.
Figure 9
11. Re-install the new light assembly in reverse order of
step 10. Use Figure 9 as reference. Route wires to
control module and attach. See Figure 8.
12. Re-attach right side panel in step 8 with 5 screws.
13. Re-attach slide plate with 2 bolts, you may choose to do
this step at a later time. This will depend on your install.
See Figure 10.
Figure 10
42035-0-0420
14. Install new left side assembly using 3 screws. See
Figure 11.
15. Line up the 2 screws coming out of the rear of the
firebox with heat shield assembly, using 2 self drilling
screws, secure heat shield as shown in Figure 12.
Empire Comfort Systems Inc. • Belleville, IL
Figure 11
Figure 12
Page 3