Fronius KD Supply 2500 Руководство по эксплуатации - Страница 13
Просмотреть онлайн или скачать pdf Руководство по эксплуатации для Сварочная система Fronius KD Supply 2500. Fronius KD Supply 2500 20 страниц.
Также для Fronius KD Supply 2500: Руководство по эксплуатации (16 страниц)
Connecting the KD Supply 2500 to the cold wire
feeder, commissioning
Connecting the
KD Supply 2500
to the cold wire
feeder, commis-
sioning
Commissioning
Power for the KD Supply 2500 is supplied by the power source
1
2
3
4
a)
b)
Connect the power source and the cold wire feeder using the interconnecting hose-
pack
Connect the welding torch
Carry out steps 1 and 2 as described in the power source and cold wire feeder oper-
ating instructions
Plug in the power source mains lead
Turn power source mains switch to position „I"
The KD Supply 2500 is now ready.
Connect the LocalNet cable or the
1
LocalNet cable from the interconnec-
ting hosepack to the LocalNet interface
of the cold wire feeder
Connect the LocalNet cable or the
2
LocalNet cable from the interconnec-
ting hosepack to the KD Supply 2500:
a)
LocalNet X9.2 interface (front) or
b)
LocalNet X9.3 interface (rear)
13