Kohler 20EORDB Операция - Страница 15

Просмотреть онлайн или скачать pdf Операция для Портативный генератор Kohler 20EORDB. Kohler 20EORDB 48 страниц. Commercial/recreational mobile generator sets

Kohler 20EORDB Операция
Control or Indicator
Item
LED display
Runtime hours
Crank indication
Fault codes
Software version
Keypad
Select and arrow
buttons
Generator set master
Three-position
switch
switch
Figure 2-4 ADC 2100 Controls and Indicators
2.5.2

Starting the Generator Set

The following procedures describe the actions required
to start the generator set.
Step
1
Fuel shut-off valve.
Open the manual fuel shut-off valve, if equipped.
2
Starting.
Place the generator set master switch in the RUN
position.
The controller attempts to start the generator set three
times. If the generator set does not start in three
attempts, the system shuts down on an overcrank fault.
Local Starting.
Move the generator set master switch to the RUN
position. The ADC 2100 attempts to start the generator
set in three crank cycles (crank cycle time is
pre-programmed).
Remote Starting.
Move the generator set master switch to the AUTO
position to allow startup by the ATS, remote start/stop
switch or remote digital gauge. A remote start/stop
switch or digital gauge can be connected to the
customer interface connection (P21 connector, leads
3 and 4. See the wiring diagrams in Section 5). See
Section 2.5.4.
Note: The ADC 2100 allows three crank cycle attempts
before the overcrank shutdown occurs.
TP-6551 2/14
Description
Displays total generator set runtime hours.
Displays CC_1, CC_2, or CC_3 to indicate the first, second or third attempt to start the
engine. The last digit flashes during the crank cycle rest periods.
Flashes a 2- or 3-letter fault code to indicate various fault conditions. See Section 2.5.5.
See the Generator Set Installation Manual.
The keypad is used for controller setup and adjustment only. Have setup and adjustments
performed only by an authorized distributor/dealer. The setup and adjustment functions are
password-protected.
Switch functions as the generator set operation and controller reset switch.
Action
2.5.3

Stopping the Generator Set

The following procedures describe the actions required
to stop the generator set.
Local Stopping.
1. Run the generator set at no load for at least
2 minutes to ensure adequate engine cooldown.
2. Move the generator set master switch to the
OFF/RESET position. The engine stops.
Remote Stopping.
1. Run the generator set at no load for at least
2 minutes to ensure adequate engine cooldown.
2. With the generator set master switch in the AUTO
position, the generator set stops when the remote
start/stop switch contacts close momentarily. See
Section 2.5.4
Section 2 Operation
15