Aqua Cooler AC-NNEBFPG Руководство по использованию и уходу - Страница 5

Просмотреть онлайн или скачать pdf Руководство по использованию и уходу для Система водоснабжения Aqua Cooler AC-NNEBFPG. Aqua Cooler AC-NNEBFPG 11 страниц. Surface mounted bottle filler conversion

INSTALLATION

The NNEBFPG comes partially assembled for shipping. Remove the kit from the packaging and
separate it into the assemblies and components shown below. Be sure not to misplace the
provided mounting screws and insulated terminals.
Tool Needed: T15 Torx bit
Your Partner in Cool.
8
INSTALLATION CONT.
Without taking the cooler off the wall, place the retrofit frame against the wall and set it onto
the top flange of the cooler frame.
Affix the frame to the wall with at least 4 anchors into any appropriate anchor points through the
staggered slotted holes. Be careful to ensure the frame stays centered on the cooler frame.
9