Billi Quadra 4100 Руководство по установке - Страница 6

Просмотреть онлайн или скачать pdf Руководство по установке для Кухня и аксессуары; светильники для ванной Billi Quadra 4100. Billi Quadra 4100 12 страниц. Tower dispenser
Также для Billi Quadra 4100: Руководство по установке (8 страниц)

Billi Quadra 4100 Руководство по установке
Installation guide
Billi Quadra – Firewall Tower
Installing the Underbench Module – Quadra
1. Flush Water Supply
Flush water supply pipework before installing the
underbench unit by connecting 600mm flexible braided
hose to the supply tap and running water into a bucket.
Blockages/unit malfunction caused by debris are not
covered under warranty.
2. Install Underbench Unit
Take care to observe minimum clearances.
Ensure there is adequate access to service the unit,
taking into account the tube lengths and space
available Refer Diagram 4, page 6.
3. Connect Dispenser Tubing and Electrical Plug
Connect all tubing and electrical plugs as shown in
Diagrams 9, 10 & 11.
Ensure correct orientation of dispenser power plug
before insertion. Trim tubes to correct lengths using
plastic tube cutter. Do not leave excess tubing which
will sag, trapping water. Fit spring clamps supplied to
retain silicone rubber tubing to barbed fittings.
IMPORTANT: Boiling outlet (red), vent tube (grey)
must not be kinked and must be installed with a
continual fall and no sag.
4. Connect Dispenser Drain Kit
a. Drill ½ inch hole (using drill bit not provided)
into drainage point (pipe).
b. Clip white john guest fitting into sliver hose
clamp.
c. Fit hose clamp to drainage pipe, ensuring the
while john guest fitting surrounds the hole
drilled.
d. Take the drain hose connection provided and
connect the 3/8 hose into the drain clamp.
e.
Connect the 3/16 hose into the condenser
outlet on the unit and tighten the nut. (Nut to
be finger tightened only).
Diagram 9
6