Dell PowerEdge 350 Руководство по установке - Страница 29
Просмотреть онлайн или скачать pdf Руководство по установке для Сервер Dell PowerEdge 350. Dell PowerEdge 350 32 страницы. Wake-on-lan (wol) support on dell servers
Также для Dell PowerEdge 350: Обновление информации о диагностике системы (2 страниц), Обновление информации (30 страниц), Установка оборудования (22 страниц), Руководство (15 страниц)
support.dell.com
captive
fastener
Figure 1-20. Installing the Cable-Management Arm
2.
Align the free end of the cable-management arm (the end with the pin and cap-
tive thumbscrew) to the back end of the right (or left) side inner rail (as viewed
from the back) of the system.
3.
Secure the cable-management arm to the inner rail with the captive thumbscrew
(see Figure 1-20).
4.
Attach the input/output (I/O) cables to their respective expansion cards on the
back of the system.
5.
Connect the remaining cables to the system.
For details, see your system's Installation and Troubleshooting Guide and User's
Guide.
6.
Secure the cables to the cable-management arm:
a.
After connecting the cables to the system, unscrew the thumbscrews that
secure the front of the server to the front vertical rail.
b.
Slide the system forward to the fully extended position.
c.
Route the cables along the cable-management arm, allowing some additional
cable slack at the hinge positions, and secure the cables to the cable-
management arm with the Velcro straps attached to the cable-management
arm.
pin
Rack Installation Guide
1-23