Dell PowerEdge 6400 Руководство по установке - Страница 34

Просмотреть онлайн или скачать pdf Руководство по установке для Сервер Dell PowerEdge 6400. Dell PowerEdge 6400 37 страниц. Wake-on-lan (wol) support on dell servers
Также для Dell PowerEdge 6400: Установка стойки (37 страниц), Руководство по установке обновления (42 страниц), Установка стойки (34 страниц), Руководство по установке (42 страниц), Руководство (10 страниц), Установка (4 страниц), Сборка и установка (32 страниц), Руководство (10 страниц), Руководство (15 страниц)

Dell PowerEdge 6400 Руководство по установке
05KCEeb1.fm Page 18 Thursday, September 14, 2000 1:37 PM
5HY ),/( /2&$7,21 5???0XOWL?9?.&(HEIP
1-18
Rack Installation Guide

Replacing the Rack Doors

The following subsections describe procedures for replacing the rack doors on the
42-U and the 24-U rack.

Replacing the Rack Doors on a 42-U Rack

CAUTION: To prevent personal injury due to the size and weight of the
doors, never attempt to replace the doors by yourself.
1.
Lift the front door into position, and align the hinges with the holes in the rack
(see Figure 1-3).
2.
Slide the hinges into the holes in the rack until the hinge release levers lock the
hinges into position.
3.
Close the door latch by rotating the handle counterclockwise until it stops, push
in the handle until it locks in position, and then slide the cover down over the
push button (see Figure 1-2).
4.
Repeat steps 1 through 3 to install the back door, but turn the handle clockwise.

Replacing the Rack Doors on a 24-U Rack

CAUTION: To prevent personal injury due to the size and weight of the
doors, never attempt to replace the doors by yourself.
1.
Lift the front door into position, and align the hinges with the hinge inserts in the
rack (see Figure 1-5).
2.
Slide the hinge pins into the hinge insert in the rack until the hinges lock into
position.
3.
Close the door latch by rotating the handle counterclockwise until it stops, and
then push the handle in until it locks in position (see Figure 1-4).
4.
Repeat steps 1 through 3 to install the back door.
This completes the rack installation for the PowerEdge system.
'(// &21),'(17,$/ 3UHOLPLQDU\