Dell EMC PowerSwitch S5148F-ON Руководство по настройке - Страница 8
Просмотреть онлайн или скачать pdf Руководство по настройке для Переключатель Dell EMC PowerSwitch S5148F-ON. Dell EMC PowerSwitch S5148F-ON 20 страниц.
Также для Dell EMC PowerSwitch S5148F-ON: Руководство по установке (45 страниц)
To install the S5148F-ON switch, complete the installation procedures in the order presented in this section.
Always handle the switch and its components with care. Avoid dropping the switch or any field replaceable units (FRUs).
NOTE:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the switch and its components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this switch.
Topics:
•
Unpack
•
Rack or cabinet installation
•
ReadyRails installation
•
1U Tool-less mount installation
•
Two-post flush-mount installation
•
Two-post center-mount installation
•
Four-post threaded installation
•
S5148F-ON installation
•
Optics installation
•
Switch power-up
•
After switch installation
Unpack
NOTE:
Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the S5148F-ON switch, make sure that the following items are included:
● One S5148F-ON switch
● One RJ-45 to DB-9 female cable
● Two sets of rail kits, no tools required
● Two PSUs
● Four fan units
● Two country- and region-specific AC power cords
● S5148F-ON Set-up Guide
● Safety and Regulatory Information
● Warranty and Support Information
1. Place the container on a clean, flat surface and cut all straps securing the container.
2. Open the container or remove the container top.
3. Carefully remove the switch from the container and place it on a secure and clean surface.
4. Remove all packing material.
5. Inspect the product and accessories for damage.
8
S5148F-ON switch Installation
S5148F-ON switch Installation
3