Dell Force10 S4820T System Руководство по началу работы - Страница 23

Просмотреть онлайн или скачать pdf Руководство по началу работы для Переключатель Dell Force10 S4820T System. Dell Force10 S4820T System 39 страниц.

Dell Force10 S4820T System Руководство по началу работы
4 Repeat this procedure for the second rail.
Two-post Center-mount Configuration:
1 Slide the plunger bracket rearward until it clicks into place and secure the
bracket to the front post flange with two user-supplied screws. Refer
to Figure 1-7, item 1.
Figure 1-7. Two-post Center-mount Configuration
2 Slide the back bracket towards the post and secure it to the post flange
with two user-supplied screws. Refer to Figure 1-7, item 2.
3 Repeat this procedure for the second rail.
17
Installation