Dell Networking S6000 System Руководство по началу работы - Страница 23

Просмотреть онлайн или скачать pdf Руководство по началу работы для Переключатель Dell Networking S6000 System. Dell Networking S6000 System 37 страниц. Dell networking s6000 high-performance 10/40 gbe top-of-rack switch
Также для Dell Networking S6000 System: Отчет о тестировании (19 страниц)

Dell Networking S6000 System Руководство по началу работы
Two-Post Center-Mount Configuration:
1 Slide the plunger bracket rearward until it clicks into place and secure the
bracket to the front post flange with two user-supplied screws. Refer
to
Figure
4-3, item 1.
Figure 4-3. Two-Post Center-Mount Configuration
2 Slide the back bracket towards the post and secure it to the post flange with
two user-supplied screws. Refer to
3 Repeat this procedure for the second rail.
Four-Post Threaded Configuration:
1 For this configuration, remove the flange ear castings from each end of the
ReadyRails assemblies. Use a Torx driver to remove the two screws from
each flange ear and remove each casting. Refer to
the castings for future rack requirements.
2 For each rail, attach the front and rear flanges to the post flanges with two
user-supplied screws at each end. Refer to
Figure
4-3, item 2.
Figure
Figure
4-4, item 2.
4-4, item 1. Retain
19
Installation