Dell Networking Z9500 Руководство по установке - Страница 17

Просмотреть онлайн или скачать pdf Руководство по установке для Переключатель Dell Networking Z9500. Dell Networking Z9500 47 страниц. Z9500 switch
Также для Dell Networking Z9500: Руководство по началу работы (34 страниц)

Dell Networking Z9500 Руководство по установке

Site Preparation

The Z9500 is suitable for installation as part of a Common Bond Network (CBN). It can be installed in:
network telecommunication facilities
data centers
other locations where the National Electric Code (NEC) applies
This chapter contains the following sections:

Site Selection

Cabinet Placement

Storing Components
Site Selection
Dell Networking equipment is intended for installation in restricted access areas. A restricted access area
can only be accessed by service personnel by using a special tool, lock, key or other means of security
and access is controlled by the authority responsible for the location.
Ensure that the area where you install your Z9500 system meets the following safety requirements:
Near an adequate power source. Connect the system to the appropriate branch circuit protection as
defined by your local electrical codes.
Environmental temperature between 32° to 104°F (0° to 40°C).
Humidity that does not exceed 85 percent noncondensing.
In a dry, clean, well-ventilated and temperature-controlled room, away from heat sources such as hot
air vents or direct sunlight.
Away from sources of severe electromagnetic noise.
Positioned in a rack or cabinet, or on a desktop with adequate space in the front, rear, and sides of the
Z9500 for proper ventilation and access.
Cabinet Placement
Install the Z9500 only in indoor cabinets designed for use in a controlled environment as described in
Selection.
The cabinet must meet the following criteria:
Minimum cabinet size and airflow are according to the Electronic Industries Alliance (EIA) standard.
Site Preparation
5
Site
17