Unpacking a S3100 Series Switch
To unpack your switch, follow these steps.
NOTE: Before unpacking the switch, inspect the container and
immediately report any evidence of damage.
When unpacking each S3100 series switch, make sure that the following
items are included:
One S3100 series switch.
One RJ-45 to DB-9 female cable.
One Dell ReadyRails™ kit for rack installation, two mounting brackets,
bolts, and cage nuts.
One set of self-adhesive rubber pads for free-standing installation (four
pads are included).
One PSU.
Getting Started Guide.
Safety and Regulatory Information.
Warranty and Support Information.
Software License Agreement.
1.
Place the container on a clean, flat surface and cut all straps securing the
container.
2.
Open the container or remove the container top.
3.
Carefully remove the switch from the container and place it on a secure
and clean surface.
4.
Remove all packing material.
5.
Inspect the product and accessories for damage.

Installing the Dell ReadyRails System

The ReadyRails rack mounting system is provided to easily configure your
rack so that you can install your switch.
The Dell ReadyRails™ system is provided for 1U front-rack and two-post
installations. The ReadyRails system includes two separately packaged rail
assemblies and two rails that are shipped attached to the sides of the switch.
Install the ReadyRails system using the 1U tool-less method or one of three
possible 1U tooled methods (two-post flush mount, two-post center mount,
or four-post threaded).
6
Installation