Miele PW 6088 EL LP План установки - Страница 8
Просмотреть онлайн или скачать pdf План установки для Стиральная машина Miele PW 6088 EL LP. Miele PW 6088 EL LP 8 страниц.
Min. flow pressure
Cold water
Max. pressure
(Soft water)
Max. throughput
On-site connection thread according to DIN 44 991
Length of connection hose
(supplied) 1 connection hose)
Water requirements (average for 60°C programme)
Standard connection (hot water fill)
Additional requirements if hot water supply is not available.
If connected to grey water supply (optional), subtract from
cold water volume.
Max. temperature
Hot water
Min. flow pressure
(Soft water)
Max. pressure
Max. throughput
On-site connection thread according to DIN 44 991
Length of connection hose
Water requirements (average for 60°C programme)
(supplied) 1 connection hose)
Machine can be connected to a hot water supply line with a
temperature of 70°C to max. 85°C. This requires a separate
inlet hose. This additional inlet hose is available from Miele
Spares. The machine must also be reprogrammed by Miele
Service or an authorised agent.
If hot water is not available, connect hot water hose to cold
water valve!
Max. temperature
Waste water
Drain hose (int. diameter)
Model versions
On-site hose connector for drain hose
with drain pump
(int. diameter x length)
Max. transient throughput
Drain pump head height (from floor level)
Vented drainage required. If ventilation is insufficient, fit Miele
kit, Mat. No. 05238090.
Drain manifolds serving several machines must be of suffi-
cient cross-section.
Miele US 6008 plinth
Fittings (supplied)
4 × metal angled brackets
(to secure machine to plinth)
4 × screws DIN 571 (Ø × length)
4 × rawl plugs (Ø × length)
Machine must be bolted to the floor!
Fixing materials for a floating screed floor are to be provided
on site.
On concrete platform
2 × clamps
2 × screws DIN 571 (Ø × length)
2 × rawl plugs (Ø × length)
Machine must be bolted to the floor!
Fixing materials for a floating screed floor are to be provided
on site.
Machine data
Unit width
Machine depth
Unit height
Casing width
Casing depth
Minimum width of delivery access to installation site
Minimum rear wall gap (measured to front of machine)
Wall gap (to front of machine)
Minimum gap ensures sufficient space for maintenance and
servicing.
Net weight
Dynamic floor load, max.
Static floor load, max.
Dynamic load, max.
Drum frequency, max.
Average heat dissipation
(dependent on ambient room temperature and
programme selected)
Sound pressure (re 20 mPA),
workplace-related (at distance of 1 m and height of 1.6 m)
Installation should only be carried out by authorised fitters in accordance with valid regulations!
Observe installation instructions when installing machine! All rights reserved! Measurements in mm.
Technical datasheet: PW 6088 EL LP
Date: 01.04.2014
kPa
100
kPa
1000
l/min
11
Inch
¾" external thread
mm
1550
l/h
approx. 70
°C
70
kPa
100
kPa
1000
l/min
11
Inch
¾" external thread
mm
1550
l/h
approx. 70
°C
70
mm
22 [DN 22]
mm
22 × 30
l/min
26
mm
1000
mm
6 × 50
mm
8 × 40
mm
6 × 50
mm
8 × 40
mm
700
mm
727
mm
1020
mm
692
mm
690
mm
720
mm
1100
mm
900
kg
140
N
2750
N
1960
N
790
Hz
22
W
not yet available
dB (A)
<70
Page: 8