360 Yield 360 Y-DROP APACHE Руководство по эксплуатации - Страница 4

Просмотреть онлайн или скачать pdf Руководство по эксплуатации для Сельскохозяйственное оборудование 360 Yield 360 Y-DROP APACHE. 360 Yield 360 Y-DROP APACHE 11 страниц.

INSTALL MOUNT ASSEMBLIES
II.
ON THE OEM PRIMARY BOOM
Figure 3
Step 1
With the threads pointing down, install
U-bolt (1) on the top of the OEM
primary boom.
Bag AF
Step 2
Install bracket assembly (2) and flange
lock nut (3).
Hardware Kit D
Step 3
Install extension tube (4).
Figure 4
Step 4
Install boom bracket (1) onto the
extension tube.
Step 5
Install stop bolts (2) at both the front
and the rear of the extension tube.
Hardware Kit B
Figure 5
Step 6
Install stainless steel set screw and
jam nut assembly (1) onto the bracket
assembly.
Hardware Kit D
Repeat Steps 1-6 for the remaining mount assemblies
on the OEM primary boom.
INSTRUCTIONS 360 Y-DROP
2
Figure 3
2
6
Figure 4
1
Figure 5
360YIELDCENTER.COM
APACHE
1
3
4
1
1
4