360 Yield 360 Y-DROP HAGIE STS 90 Руководство по эксплуатации - Страница 3

Просмотреть онлайн или скачать pdf Руководство по эксплуатации для Сельскохозяйственное оборудование 360 Yield 360 Y-DROP HAGIE STS 90. 360 Yield 360 Y-DROP HAGIE STS 90 11 страниц. Steel booms

ESTABLISH
I.
DROP LOCATIONS
Figures 1 and 2
Step 1
Locate the center of the machine and
identify the location of all the drops. On
the sprayer boom, mark where each riser
mount will be located. This will ensure
that the extension tubes will not interfere
with the riser mounts.
Figure 3
Step 2
From the center, measure out 51" (±5") on
either side, as shown in Figure 3.
NOTE: The center mounting position will
have to be offset in order to eliminate
conflict with the center riser mount.
Step 3
For the primary boom; starting at the
wing fold pivot pin, measure out and
make marks at 50", 104", 168", 223" and
272" (all measurements are ±5"). Repeat
for the other primary boom.
INSTRUCTIONS 360 Y-DROP
HAGIE STS 80', 90' & 100' STEEL BOOMS
Figure 1
Figure 2
Figure 3
360YIELDCENTER.COM
3