Miele PDR 522 Инструкции по эксплуатации и установке - Страница 18

Просмотреть онлайн или скачать pdf Инструкции по эксплуатации и установке для Сушилка Miele PDR 522. Miele PDR 522 36 страниц. Commercial tumble dryers
Также для Miele PDR 522: Инструкции по эксплуатации и установке (38 страниц)

Miele PDR 522 Инструкции по эксплуатации и установке

Initial commissioning

 Risk of injury or damage to property due to improper installation.
Incorrect installation of the tumble dryer can lead to personal injury or damage to prop-
erty.
Before commissioning the tumble dryer for the first time, make sure it has been installed
correctly.
Connect the tumble dryer correctly.
Please follow the instructions in "Installation".
Complete the initial commissioning process. During the initial commissioning process,
you will need to define the settings for daily use of the tumble dryer. Some settings can
only be modified during the initial commissioning process. After that, they can only be
changed by the Miele Customer Service Department.
18