Miele PT 6185 Руководство по эксплуатации - Страница 18
Просмотреть онлайн или скачать pdf Руководство по эксплуатации для Сушилка Miele PT 6185. Miele PT 6185 20 страниц.
Installation
Leveling the unit
The machine must be leveled for proper
operation. The machine does not need to be
installed on a base, however any
unevenness in the floor must be
compensated for.
^ Level the machine by adjusting the screw
feet.
^ Once leveled the discs must be turned
with a screwdriver against the machine's
base plate.
18
Electrical connection
The electrical connections to the dryer must
be in accordance with instructions given on
the installation diagram and comply with
local regulations.
Once installed in position all detachable
outer housing parts must be refitted.
THIS APPLIANCE MUST BE
GROUNDED.
Before installation, make sure that the
voltage and frequency listed on the data
plate correspond with the sites electrical
supply.
Follow the instructions given on the enclosed
wiring diagram.
The electrical heating is set by factory
default to 8.1 kW.