Miller Travel Master SB-10D Руководство пользователя - Страница 12
Просмотреть онлайн или скачать pdf Руководство пользователя для Сварочные принадлежности Miller Travel Master SB-10D. Miller Travel Master SB-10D 44 страницы. Automatic welding sidebeam
*Terminals located on either terminal strip 1T or terminal
strip 2T in weld control.
6.
To connect cord C to weld control, proceed as fol-
lows:
a. For 2A models only, reinstall jumper link be-
tween terminals M and N of terminal strip 2T,
and connect cord between terminals L and P of
2T. Proceed to Step 7.
b. For 9A models only, remove snubber at termi-
nals G and H of terminal strip 3T, and connect
cord between terminals G and H of 3T. Proceed
to Step 7.
c. For all models except the 2A and 9A, route end
of cord C with friction terminals through clamp
to receptacle RC4. (RC4 is located on compo-
nent mounting panel on rear panel of unit, and
connections can be made to its 3/16 inch male
friction connectors.)
d. Install friction terminals to terminals F and H of
receptacle RC4.
7.
Tighten strain relief clamp, if applicable.
8.
Close and secure access door.
B. Connections to Sidebeam Carriage Control
WARNING: Read and follow safety informa-
tion at beginning of entire Section 4-2 before
proceeding.
1.
If applicable, remove the four screws securing
the Carriage Control to the mounting bracket,
and remove the control from the bracket.
AUTOMATIC 1A
Weld Control
elding
Power
Source
D
C
Shunt
Control
Diagram 4-1. Connection Diagram For AUTOMATIC 1A Weld Control Models
OM-889 Page 8
F
A
G
E
D
C
B
Wire
Drive
Assembly
2.
Remove the securing screws from control wrap-
per, and remove wrapper.
3.
Loosen upper strain relief clamp on rear of con-
trol.
4.
To connect cord R to Carriage Control, proceed
as follows:
a. Locate terminal strip 2T mounted vertically on a
bracket within the Carriage Control.
b. Route remaining spade terminal end of cord R
through clamp to terminal strip 2T.
c. Install spade terminals to terminals A and B on
2T.
5.
To connect cord C to Carriage Control, proceed
as follows:
IMPORTANT: If the Carriage Control is equipped with
the optional Delay Time Control, disregard the following
installation instructions, and refer to field installation in-
structions for Delay Time Control Option.
a. Locate terminal strip 1T mounted to the bottom
panel of the Carriage Control.
b. Route remaining spade terminal end of cord C
to terminal strip 1T.
c. Remove jumper links between terminals C and
D and terminals K and L on terminal strip 1T.
d. Connect friction terminals from cord to terminal
D and L on terminal strip 1T.
6.
Tighten strain relief clamp, and reinstall and se-
cure control wrapper.
7.
If applicable, reposition and secure control onto
mounting bracket.
Rear View Of
Carriage Control
E
Drive Motor
F
H
115 VAC Cord
And Plug
Automatic
Flux Valve
(Optional)
A
Workpiece
S-0260
Carriage
25 ft. (8 m) Voltage
A
Sensing Cord
5 ft. (1.5 m) Motor
B
Control Cord
10 ft. (3 m) Shunt
C
Control Cord
25 ft. (8 m) Electrical
D
Input/Contactor
Control/Voltage
Control Cord
E
6 ft. (1.8 m) Remote
Start/Stop Cord
(Spade Terminal Ends)
F
6 ft. (1.8 m) Carriage
Movement Control
Cord (Friction Lug
and Spade Terminal
Ends)
G
Accessory/External
Control Device
Connection
H
5 ft. (1.5 m) Carriage
Control Motor Cord