Aquaport AQP-FKL-C Руководство пользователя - Страница 9
Просмотреть онлайн или скачать pdf Руководство пользователя для Системы фильтрации воды Aquaport AQP-FKL-C. Aquaport AQP-FKL-C 16 страниц. The caravan/marine water filtration system
E. TUBING INSTALLATION
The Filtration System has been supplied with quick and easy to
install quick connections.
1. Measure a length of 1/4" tubing (4) to run from the Shut
off valve (7) to the filter head inlet (3c) and another length
of tubing to run from the filter head outlet (3d) to the faucet
connection piece (9) at the base of the filtered water faucet.
2. Install the tubing as per the typical installation diagram on
page 3. To install tubing, push tubing into connections and give
a slight pull to ensure tubing is secure.
Note: check the end of the tubing to make sure there are no cuts,
nicks, flat spots or sharp edges. If any of these are present, re-cut
the end with a tube cutter or utility knife. The cut must be perfectly
straight with no angle, otherwise leaking from the connections may
occur. See Fig 4.
Note: To remove tubing, push collet against the face of fitting and
remove the hose (with collet still held against fitting face). See Fig
5.
3. Locate a position along the 1/4" tubing (4), between the shut
off valve (7) and filter head inlet (3c). Cut tubing with utility
knife or tube cutter and remove sufficient tubing to insert both
check valves (5). Make sure there are no imperfections and
that the end of the tubing is cut square.
4. Connect tubing to both check valves (5), ensuring that
the water flow is in the direction of the arrow located on
the check valve.
IMPORTANT: It is a requirement under Australian Plumbing
Standards that both Check Valves be installed. If these parts
are not installed all warranties are null and void.
Fig 4
3/4"
Correct Cut
19mm
Incorrect Cut
Fig 5
White Collet
Do Not Remove
3/4"
Insert 1/4"
Tube to Line
19mm
Push
Push Collet
Collet
Pull
Pull Tubing
Tubing
INSTALLATION AND OPERATING INSTRUCTIONS 7