Burlington B1 UP 3TH Руководство - Страница 4
Просмотреть онлайн или скачать pdf Руководство для Сантехника Burlington B1 UP 3TH. Burlington B1 UP 3TH 6 страниц. Upstand ceramic basins
INSTALLATION
1
A
Wall Mounted Installation.
The recommended height from the floor to the tap platform is
850/870mm.
Measure distances A & B using a spirit level and offering the
basin to the wall if necessary. Mark the wall.
3
A
Installation with wash stand.
Check that you have the correct washstand before
undertaking the installation. Follow the installation manual
supplied with the wash stand.
Once the wash stand is fully assembled, place the basin in
position ensuring that it is level. Measure distance A and mark
the wall.
4
A
B
A
2
A
Installation with pedestal.
Measure distance A, then place the basin on the pedestal, and
taking care not to let go of the basin while it is balanced on
the pedestal, measure distance B. Mark the wall.
4
The basin must always be fixed to the wall using appropriate
wall fixings.
Drill the marked locations and install the basin on the wall,
ensuring it is level and fully secured by the wall fixings.
A
B