Burndy Continental Industries thermOweld BR-5 Инструкции

Просмотреть онлайн или скачать pdf Инструкции для Кабели и разъемы Burndy Continental Industries thermOweld BR-5. Burndy Continental Industries thermOweld BR-5 2 страницы. Thermoweld grounding connections - bus bar to ground rod

thermOweld
INSTRUCTIONS FOR THERMOWELD GROUNDING CONNECTIONS - BUS BAR TO GROUND ROD
BR-1
Place end of bar under the
center of the tap hole. Bar
must sit on top of ground rod.
Use locking pliers or a clamp
on the rod below the mold to
prevent it from slipping when
the mold is fired.
BR-4
Butt ground rod against bar. Edge of
bar must be in contact with mold to
prevent leakage.
+1 (918) 627-5210 • 1-800-558-1373 • WWW.THERMOWELD.COM
ELECTRICAL GROUNDING • CATHODIC PROTECTION • ELECTRIC UTILITY • RAIL
BR-12
Place end of bar to center of tap hole.
Bar must sit on top of ground rod.
Use locking pliers or a clamp on the
rod below the mold to prevent it from
slipping when the mold is fired.
BR-7
Place edge of bar under center of tap
hole. Edge of bar must be in contact
with mold to prevent leakage. Use
a pair of locking pliers or a clamp
below mold on ground rod to support
the mold and prevent slipping.
Tel. +1.800.558.1373
Tel. +1.918.627.5210
®
The Contractors Choice
BR-8
Butt bar against ground rod. Use a pair of locking
pliers or a clamp below mold on ground rod to support
the mold and prevent slipping.
www.thermoweld.com
BR-2
Place bar in the mold. Bar must sit
on top of ground rod. Use locking
pliers or a clamp on the rod below
the mold to prevent it from slipping
when the mold is fired.
BR-5
Butt bar agaist ground rod.
ECN 2552 REV "E" 03/05/13
34-5381-07