Burndy Continental Industries thermOweld CB-19 Инструкции

Просмотреть онлайн или скачать pdf Инструкции для Кабели и разъемы Burndy Continental Industries thermOweld CB-19. Burndy Continental Industries thermOweld CB-19 2 страницы. Thermoweld grounding connections - cable to bus bar

thermOweld
INSTRUCTIONS FOR THERMOWELD GROUNDING CONNECTIONS - CABLE TO BUS BAR
CB-18
Insert the cable into mold until
it butts against the bar.
CB-22
Insert the cable into mold until it butts against the bar.
CB-37
Place end of cable to center of tap hole, then place mold
on bar.
+1 (918) 627-5210 • 1-800-558-1373 • WWW.THERMOWELD.COM
ELECTRICAL GROUNDING • CATHODIC PROTECTION • ELECTRIC UTILITY • RAIL
®
The Contractors Choice
CB-19
Insert the cable into
mold until it butts
against the bar.
CB-25
Place end of cable to
center of tap hole, then
place mold on bar.
CB-38
Place edge of bar under center of tap
hole. Edge of bar must be in contact
with mold to prevent leakage. Butt end
of cable against bar.
Tel. +1.800.558.1373
Tel. +1.918.627.5210
www.thermoweld.com
ECN 2552 REV "J" 03/06/13
34-5657-08