AquaScape 78205 Инструкции по установке и обслуживанию - Страница 5

Просмотреть онлайн или скачать pdf Инструкции по установке и обслуживанию для Открытый фонтан AquaScape 78205. AquaScape 78205 12 страниц.
Также для AquaScape 78205: Инструкции по установке и обслуживанию (8 страниц)

AquaScape 78205 Инструкции по установке и обслуживанию
NOTE: Water movement can be customized using the tee
fitting or standpipe. Install the standpipe with the tee fitting
or remove the standpipe completely to create a calm,
smooth effect. To create a more dramatic, bubbling effect,
install the standpipe without the tee fitting.
LEVEL THE FOUNTAIN
• It is important to make sure the
Spillway Bowl, Spillway Basin,
and Spillway Bowl Stands are
level from front to back and side
to side (Ex. 9).
• Additional stabilization, such as
using compacted screening bed
material, may be required based
on soil conditions.

Applications

• The Spillway Bowl and Spillway Basin are extremely
versatile for installation in a variety of applications. Below
are several examples of the wide variety of installation
options.
1. Spillway Bowl and Spillway Basin on an AquaBasin:
2. Spillway Bowl and Spillway Basin on top of AquaBlox
3. Spillway Bowl at the top of a stream:
aquascapeinc.com |
CAN (866)766-3426 |
4. Multiple Spillway Bowls:
5. Spillway Basin in a stream:
Ex. 9
6. Spillway Basin in the middle of a pond:

General Maintenance

:
®
• Remove leaves, sticks, and debris from the feature as
needed. If necessary, drain the feature of dirty water and
refill with fresh, clean water.
• Clean the pump periodically or if water flow slows.

Winter Application

It is recommended to drain the Spillway Bowl or Spillway
Basin and store it in a frost-free location. Remove the
standpipe to drain for winterization.
US (866)877-6637
5